Section 02
Capability
Structural work and infrastructure are self-performed with owned plant and directly employed labour.
Structural Works
Foundations, structural frame, masonry, roofing and finishes for residential and non-residential buildings.
From site clearance and excavation through to the last coat of paint: shallow and deep foundations, reinforced concrete frame, blockwork and masonry, roofing, internal and external finishes. Hotel, resort villa and residential structures make up most of the register.
- Site preparation, clearing, grading and excavation
- Shallow and deep foundations
- Reinforced concrete frame and structural works
- Concrete and masonry works
- Roofing and exterior finishes
- Interior finishes, flooring, kitchens and bathrooms
- Painting, decorating and landscaping
Infrastructure Works
Water and sewerage networks, wadi crossings, gabion and riprap protection, chambers and marker posts.
Protection and reinforcement works on live water transmission mains, delivered as a subcontractor to the EPC contractors running the national schemes. Flash-flood resistance is the whole point of the work: the barrier has to hold under hydraulic force, bed scour and debris impact.
- Foul and storm sewerage networks, pumping and connections
- Water, electricity and telephone networks and stations
- Wadi crossing protection: gabion, riprap and stone pitching
- Reinforced concrete pipeline encasement
- Chambers, valve pits and access structures
- Galvanised marker posts on concrete footings with reflective plates
Products & Supply
Construction materials and petroleum industry chemicals, supplied by the contractor that installs them.
The catalogue runs from the binder in the foundation to the tile on the wall, and from drilling fluids to refining additives. Materials specified by people who have installed them on site, delivered to the plot or to the yard, with a quotation you can raise online from the catalogue itself.
- Structural materials: cement, aggregates, steel, concrete, blockwork and timber
- Thermal, acoustic and waterproofing materials
- Exterior cladding, stone and glass facades
- Interior finishes, flooring, kitchen and bathroom
- Drilling, production, refining and exploration chemicals
- Quotations and orders raised online from the catalogue
Civil & Well Pad Works
Civil construction and site development works for well pads and associated oil & gas infrastructure.
Civil works supporting the development and preparation of well pad sites and associated infrastructure. The scope covers site preparation, excavation and earthworks, concrete works, access development, drainage and general civil construction required to support safe and efficient field operations.
- Well Pad Development
- Excavation & Earthworks
- Concrete & Foundation Works
- Site Preparation & Grading
- Access Roads & Hardstanding
- Drainage & Civil Works
Electrical Works
Electrical installation works supporting building, infrastructure and industrial projects.
Electrical installation works for a range of construction and infrastructure projects, covering the installation of electrical systems, cabling, containment, lighting and associated electrical works in accordance with project requirements and applicable standards.
- Electrical Installations
- Cabling & Wiring
- Cable Containment Systems
- Lighting Systems
- Electrical Panels & Connections
- Testing & Commissioning Support
Pre-construction
Before the first excavation
- Project management
- Oversight of the construction process from start to finish, including planning and coordination of all site activities.
- Site selection and evaluation
- Feasibility studies and site analysis to determine the best location for the build.
- Cost estimation, scheduling and procurement
- Budgets and programmes established up front, with procurement run against them.
- Subcontractor management
- Where a specialist trade is genuinely needed, it is contracted and its performance is supervised by us.
Construction
On site
- Site preparation, foundations and structural work
- Clearing land, setting out and building the foundations and frame.
- Concrete and masonry work
- Pouring concrete and laying masonry for structural components.
- Water and sewerage networks
- Foul, storm and potable networks laid, tested and connected, within the plot and beyond it.
- Wadi crossings and pipeline protection
- Gabion, riprap and reinforced concrete encasement on live transmission mains.
- Interior and exterior finishes
- Final touches to functionality and appearance, including cladding.
Manpower and plant
What we bring to site
Directly employed, and owned. Neither the labour nor the plant is hired in for the job.
Manpower
- 04 engineers and foremen
- 74 skilled and unskilled labour
Owned plant
- 02 mixer machines
- 03 wheel loaders
- 02 JCB
- 02 tippers
- 02 JCB skid steer loaders
- 02 boom loaders
- 02 excavators
- 03 pickups
- 01 3-ton roller compactor
- 01 1-ton roller compactor
Plus shuttering material, jacks, heavy-duty scaffolding, steel cutters and hand tools.
Next step
Put the scope in front of us.
Send the drawings, the location and the programme. You get back a straight answer on whether we are the right contractor for it, and what it takes.